IETS

GROUNDWATER / SURFACE WATER ABSTRACTION



IETS OVERVIEW




INTRODUCTION
The industrial effluent  treatment system  is designed  to treat  industrial effluent  waste water   generated from  the SMR processing. An  average of 1500 m3  raw waste water  will be generated daily within  maximum 12 hours of working hour.
Figure 1 :  Factory plan layout


                        Figure 2 :  Industrial Effluent Treatment System plan layout












































































06SEPT2017




No comments:

Post a Comment